Northern-Auger Workshop at FNAL
Updated on
October 3rd (Friday) at Main Auditorium
[10]
Goal/Agenda of the meeting (Arisaka)
[10]
All sky coverage with Northern Auger (Cronin)
[10] Science
Case (Olinto)
[10] Science
Case (Ralph Engel)
[10] Science
Case (Sommers)
[20]
Open Discussion on Science Case
[10]
Concept of Extended Auger Observatory (Arisaka)
[15]
Aperture of Extended array (Chou)
[45]
Update on sites
-
[10]
-
[10]
-
[10] Atmosphere Condition at
-
[10] Atmosphere Condition at
-
[5] Extension of Malargue site (Ingo Allekotte)
[20]
Open Discussion on site
[40]
Presentation on Possible Detector Options
-
[20] Radio Detection (Andreas Haungs)
-
[10] Water Tank (
-
[10] Water Tank (Arun Tripathi)
[50]
Open Discussion of Detector Option
- [20] With or Without FD? (Watson/Sommers)
-
[10] Outrigger
-
[10] Infill/Dense Array
-
[10] Radio Option
[30] Discussion and Formation of Working Groups
- [10] Tasks/Plan on four
working groups (Arisaka)
- [5] Science Case (Olinto/Parizot/…)
- [5] Detector R&D (Bluemer/Mantsch/…)
- [5] Detector Simulation &
Optimization (Sommers/Knapp/…)
- [5] Site/Coordination (Nitz/Harton/…)
Wine
& Cheese talk (SNO/
Reception/informal
discussion at
- Working
group discussion
Oct 4th (Saturday) at Main Auditorium
[10] Brief Summary
of Friday Discussion (Watson)
[30]
Status and Plan on Southern Auger
-
Construction schedule/ expected sensitivity (Mantsch)
-
Strategic Plan on early physics release (Watson)
[20]
Status and Science case of TA (
[20]
Future Plan & Low energy extension of HiRes (Thomson/Sokolsky)
[30] Question
& Discussion on TA/HiRes
[80]
Report/Discussion on working groups (led by group leaders)
- [20] Science case
- [20] Detector R&D
-
High priority items,
-
Schedule, Budget
- [20] Detector simulation
& optimization
- [20] Site/Coordination:
-
Selection criteria
-
Action items, schedule, Budget
[30] Short
presentation by new/potential collaborators
-
[5] Utah/HiRes (Sokolsky)
-
[5] MPI (Teshima)
-
[5]
-…
[30]
Collaboration with TA
[20]
Preparation of EOI/Funding Request
[20]
Long term schedule/ Plan for full proposal
Collaboration
buffet dinner at Prairie Landing Golf Course